What Should I Ask a Flying Theater Manufacturer in China Before I Buy?
Ten questions to put to every supplier, in writing, so offers can be compared: from factory and specifications to production time, warranty, films and maintenance, with Waku’s own answers.

Ask every supplier the same ten questions in writing and compare the answers side by side: whether they make the equipment themselves, the exact room size and power for your seat count, production time, warranty, what films are included and what updates cost, the maintenance routine, who installs and trains, and which running sites you can check. A manufacturer should answer all ten with figures, not ranges of adjectives.

Which questions should I ask, and how does Waku answer them?
| Question | Why ask | Waku’s answer |
|---|---|---|
| 1. Do you make the equipment yourselves? | Traders add cost and slow support | Yes, in our 5,000 m² factory in Panyu, Guangzhou |
| 2. What room size and power does my seat count need? | Decides whether your site works | Minimum rooms from 6 × 5 × 3.2 m (Bermuda) and 6 × 6 × 3 m (5D); 380 V, about 10–60 kW by model and configuration; layout drawing with the quotation |
| 3. How long is production? | Sets your opening date | 20 to 25 days from order, then shipping and installation |
| 4. What is the warranty? | Defines who pays for repairs | One year |
| 5. Which parts wear and need replacing? | Hidden running cost | No scheduled wear-part replacement; bubble and snow fluid are the consumables |
| 6. What maintenance does it need? | Staff time and downtime | Grease the motion platform joints and re-tighten bolts every 2 to 3 months |
| 7. How many films are included, and do updates cost extra? | Films bring repeat visits | The dome flying theater ships with 30 films; updates are free |
| 8. Who installs and trains my staff? | Opening depends on it | Installation guidance and operator training are part of our service |
| 9. Can I check running sites? | Proof the equipment works in operation | More than 100 projects delivered; reference list and video calls on request |
| 10. Which documents back the technology? | Shows the supplier owns its designs | 10 utility-model patents, 3 design patents, 8 software copyrights, 20 work registrations; copies on request |
Is the supplier a manufacturer or a trading company?
| Question | A manufacturer can | A trading company often |
|---|---|---|
| Factory | Show its own workshop live on video, on the day you ask | Sends photos, or tours a factory that is not in its name |
| Product range | Focuses on a few theater types it designs and builds | Offers every kind of ride and arcade game |
| Engineering | Answers questions on motion, power and layout directly | Relays questions and answers later |
| Patents | Holds patents and software copyrights in its own name | Shows certificates in another company’s name |
| Films and software | Makes its own ride films and show-control software | Depends on the factory for both |
How do I verify the factory?
Ask for a live video walk through the workshop, not a prepared clip: you should see motion seats and platforms in assembly and equipment packed for shipping. Better still, visit. Waku welcomes factory visits and video tours.

- Company records: the business licence, the contract and the bank account should carry the same company name.
- Patents: certificates in the company’s own name. Waku holds 10 utility-model patents, 3 design patents, 8 software copyrights and 20 film and artwork registrations.
- Running sites: a video call from a venue that runs the theater, not only photos.
Where can I meet flying theater manufacturers?

| Fair | Where | When |
|---|---|---|
| IAAPA Expo | Orange County Convention Center, Orlando | 16–20 November 2026 (show floor 17–20 November) |
| IAAPA Expo Middle East | Abu Dhabi | 12–15 April 2027 |
| IAAPA Expo Asia | Osaka | 28 June–1 July 2027 |
| IAAPA Expo Europe | Vienna | 20–24 September 2027 |
| Canton Fair (China Import and Export Fair) | Guangzhou | Spring and autumn every year |
IAAPA Expos gather attraction suppliers in one hall. Waku’s factory is in Panyu District, Guangzhou, so a visit can be combined with the Canton Fair.
How long does it take from order to opening?
Production takes 20 to 25 days from order. Shipping time depends on your port, and installation, commissioning and staff training follow on site. Ask every supplier for a dated schedule of these steps.

What should I check in the contract?
- The exact model, seat count, screen and projection model.
- The list of films included and the terms for updates.
- Production time, shipping terms and the installation schedule.
- Warranty length and what it covers.
- Payment terms and what happens if a milestone is missed.
- The certifications and inspections your country requires for amusement equipment, and who provides the documents.
How do I compare suppliers fairly?
Put each supplier’s answers to the ten questions in one table, then calculate guests per hour for each offer: seats × (60 ÷ cycle minutes). The cheapest offer is rarely the lowest cost once films, wear parts and downtime are counted. Compare our models in the guide to choosing a flying theater, read about our factory, or send your questions.
Use the answers with our cost guide to compare quotations line by line, and check running sites on our projects page.
For shipping terms, payment and customs, see how to import a flying theater or 5D cinema from China.
Buying through a sourcing agent? See whether to use a China sourcing agent for a flying theater. Want to represent a theater maker in your country? Read how to become a flying theater distributor.
Frequently asked questions
How long does Waku take to produce a theater?
20 to 25 days from order, followed by shipping and installation.
What warranty does Waku give?
One year.
Can I visit the factory?
Yes, in Panyu, Guangzhou, by appointment; video tours are also available.
Can I talk to an existing customer?
Yes. We share a reference list and arrange video calls with operators, with the venue’s agreement.
Are film updates charged?
No. Film updates are free.
Talk to the factory
Tell us your country, venue size and ceiling height. We reply with a recommendation and a quotation.





